Problem

A large dairy farm was experiencing major odor problems generated from the holding tank beneath the maturity barn. The barn was being rinsed twice daily and the holding tank was being pumped out once per month. When the tank was pumped large concentration of straw and animal waste were present.

Solution

An Organic Product was applied to the holding tank and odors were practically eliminated with 24 hours. The farm continued to apply the product daily for 30 days and the odor problem was solved.

The retention tank was pumped at the end of the 30-day period. The farm reported total degradation of all waste, including the straw.

Conclusion

The Organic Product eliminated the odors, the primary objective. The product also degraded the waste, including the cellulose, simplifying the pumping and land application process. The farm continues to apply the product on a daily basis.

Our Products

Hydrogen sulfide, mercaptans
and ammonia odor control.

Landfills, Wastewaters, Septic tanks, Anaerobic digesters, RV holding tanks

Odors and solid waste control.

Animal farms, settling ponds,
lagoons and barns

Nutrients, yield, plant health and water holding capacity enhancement.

Crops, plants, soils, root systems

Residual hydrocarbon and odors remediation and control.

Oilfield produced, flowback and wastewaters